USB RF Avg Power Sensor, 10 MHz to 18 GHz, -60 to +20 dBm (Avg), -45 to +20 dBm(Pulse) - 2.92 connector
Open Market/ 45 Days
USB RF Peak Power Sensor, 50 MHz to 8 GHz, -60 to +20 dBm (Avg), -50 to +20 dBm (Pulse)
Open Market/ 4 Weeks
USB RF Avg Power Sensor, 10 MHz to 40 GHz, -60 to +20 dBm (Avg), -45 to +20 dBm(Pulse) - 2.92 connector
Open Market/ 45 Days
RTP4040 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 45 Days
CPS2008 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 3 Weeks
Programmable Noise Generator, 1 GHz to 2 GHz
Open Market/ 45 Days
Full-width 19" Rack Mount Kit (includes handles & hardware for mounting one or two generators)
Open Market/ 45 Days
RTP4006 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 45 Days
RTP5006 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 4 Weeks
RTP5008 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 4 Weeks
RTP5340 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 4 Weeks
RTP5518 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 4 Weeks
GPIB Control - Installed internally at factory
Open Market/ 45 Days
RTP5318 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 4 Weeks
Moves RF output to the rear panel
Open Market/ 45 Days
Full-width 19" Rack Mount Kit (includes handles & hardware for mounting one or two generators)
Open Market/ 45 Days
Removes internal microSD and enables boot from USB drive (included)
Open Market/ 45 Days
Transit case
Open Market/ 45 Days
Programmable Noise Generator, 10 MHz to 500 MHz
Open Market/ 45 Days
Programmable Noise Generator, 10 MHz to 1.5 GHz
Open Market/ 45 Days
Transit case
Open Market/ 45 Days
RF Signal Generator (100 MHz to 18 GHz)
Open Market/ 45 Days
Programmable Noise Generator, 10 MHz to 2 GHz
Open Market/ 45 Days
Programmable Noise Generator, 10 MHz to 3 GHz
Open Market/ 45 Days
RTP4018-S/1 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 45 Days
RTP4106 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 45 Days
Upgrade initial Standard Calibration to 17025 accredited calibration with data. Must be ordered with initial instrument purchase. Valid for all RTP5000 models.
Open Market/ 4 Weeks
RTP5540 Single prepaid return to factory for calibration. Valid for 18 months from the date of delivery.
Open Market/ 4 Weeks
RF Signal Generator (10 MHz to 3 GHz)
Open Market/ 45 Days
RF Signal Generator (10 MHz to 6 GHz)
Open Market/ 45 Days
Installation SGX1K-SECURE post initial purchase (retrofit); requires return to factory
Open Market/ 45 Days
Additional external USB drive for secure operation
Open Market/ 45 Days
USB RF Peak Power Sensor, 50 MHz to 18 GHz, -50 to +20 dBm (Avg), -40 to +20 dBm (Pulse)
Open Market/ 6 Weeks
USB RF Peak Power Sensor, 50 MHz to 6 GHz, -60 to +20 dBm (Avg), -50 to +20 dBm (Pulse)
Open Market/ 4 Weeks
USB RF Peak Power Sensor, 50 MHz to 18 GHz, -34 to +20 dBm (Avg), -24 to +20 dBm (Pulse)
Open Market/ 6 Weeks
USB RF Peak Power Sensor, 50 MHz to 40 GHz, -34 to +20 dBm (Avg), -24 to +20 dBm (Pulse)
Open Market/ 8 Weeks
USB RF Peak Power Sensor, 50 MHz to 40 GHz, -50 to +20 dBm (Avg), -40 to +20 dBm (Pulse)
Open Market/ 8 Weeks
6-ft SeaLATCH locking USB cable
Open Market/ 5 Weeks
USB RF Avg Power Sensor, 50 MHz to 8 GHz, -40 to +20 dBm
Open Market/ 3 Weeks
7ft Ethernet cable
Open Market/ 2 Weeks
USB AC adapter
Open Market/ 2 Weeks
USB RF Avg Power Sensor, 10 MHz to 6 GHz, -60 to +20 dBm (Avg), -45 to +20 dBm (Pulse)
Open Market/ 45 Days
USB RF Avg Power Sensor, 4 kHz to 6 GHz, -50 to +20 dBm (Avg), -45 to +20 dBm (Pulse)
Open Market/ 45 Days
POE Injector, IEEE-802.3af
Open Market/ 2 Weeks
RF Power Meter, Dual Channel 4 kHz - 40 GHz
Open Market/ 3 Weeks
Add 2 Active Channels (for a total of 4) - Field Upgradeable
Open Market/ 3 Weeks
Full-width 19" Rack Mount Kit (includes handles & hardware for mounting one or two meters)
Open Market/ 3 Weeks
Additional external USB drive for secure operation
Open Market/ 3 Weeks
GPIB Control - Installed internally at factory
Open Market/ 3 Weeks
Moves Test Source output to the rear panel
Open Market/ 3 Weeks